REPORT FROM THE SITE
 
Preparations before making foundations for wind-power plant. The dimensions of the foundation are 18.5 x 18.5 m and it is 1.5 m high. About 520 m3 of concrete and 48 tons of steel were used to make it.
Preparing excavation for wind-power plant foundation and reinforcing it.
Reinforcing the foundation.
Foundation reinforcement works; 28 mm diameter steel.
Preparing the framework to be filled with concrete. Reinforcement grating inside tower ring. (Ring diameter ca. 4.5 m)
Preparing foundation and framework to be filled with concrete.
Elements of the crane (jib 100 m, capacity 750 ton) for assembling wind-power plants.
Assembly of wind-power plant mast of 76.5 m height and 170 ton weight, consisting of 4 segments.
Transportation of Vestas V.80 wind-power plant rotor and pod.
Preparing for the assembly of EW 2 wind-power plant blades
Fixing the blades of EW 2 wind-power plant.
View of Vestas V.80 wind-power plant after assembling the blades; blade-span: 80 m.
From the plane
 