| Preparations before making foundations for wind-power plant. The dimensions of the foundation are 18.5 x 18.5 m and it is 1.5 m high. About 520 m3 of concrete and 48 tons of steel were used to make it. |
|
 |
 |
 |
|
| Preparing excavation for wind-power plant foundation and reinforcing it. |
|
 |
 |
 |
|
 |
 |
 |
|
| Reinforcing the foundation. |
|
 |
 |
 |
|
| Foundation reinforcement works; 28 mm diameter steel. |
|
 |
 |
 |
|
| Preparing the framework to be filled with concrete. Reinforcement grating inside tower ring. (Ring diameter ca. 4.5 m) |
|
 |
 |
 |
|
| Preparing foundation and framework to be filled with concrete. |
|
 |
 |
 |
|
| Elements of the crane (jib 100 m, capacity 750 ton) for assembling wind-power plants. |
|
 |
 |
 |
|
| Assembly of wind-power plant mast of 76.5 m height and 170 ton weight, consisting of 4 segments. |
|
 |
 |
 |
|
| Transportation of Vestas V.80 wind-power plant rotor and pod. |
|
 |
 |
 |
|
| Preparing for the assembly of EW 2 wind-power plant blades |
|
 |
 |
 |
|
| Fixing the blades of EW 2 wind-power plant. |
|
 |
 |
 |
|
| View of Vestas V.80 wind-power plant after assembling the blades; blade-span: 80 m. |
|
 |
 |
 |
|
 |
 |
 |
|
|
|
 |
 |
 |
|
 |
 |
 |
|
| From the plane |
|